Apply or search for permits
Well Construction Permits
A permit is required prior to the construction of all new wells and the repair, modification or abandonment of an existing well regardless of the size. The permit ensures that wells are built by licensed water well contractors and conform to water well construction standards within the State of Florida.
The South Florida Water Management District, or its Delegated Agencies, issue permits for water and monitor wells. Please see the Permit Submittal Locations document for contact information and permit submittal locations within SFWMD.
You will need a Well Construction Permit for:
- New wells
- Repair or modification of an existing well
- Abandonment of a well
- Test wells
- Monitor wells
- Test holes that will be converted to a water use well
An application for a water well construction, repair, modification or abandonment permit in Monroe County, Charlotte County, and for wells 12" or greater in diameter in Broward County can be submitted via the ePermitting Home page by selecting Application Submittals/Water Well Construction. Well Completion Reports may also be submitted through this system for all counties.
A consumptive water use permit (WUP) may also be required if the well is being used for any purpose other than what is listed below:
- Wells for single family homes or duplexes with one well,
- Firefighting wells
If required, a WUP will need to be issued before a water well construction, repair, modification or abandonment permit will be issued. An application for a WUP can be submitted via the ePermitting Home page by selecting Application Submittals/New, Modify, Renew. More information can be found on the Consumptive Water Use Permits page.
If you have any questions or require assistance regarding Well Construction Permitting or Well Contractor Licensing, please contact us at wells@sfwmd.gov or (561) 682-6930.
Well Construction Permitting Fees »
Well Construction Permit |
$ 100 |
Well Contractor License Application/Exam Fee (effective Sept. 26, 2012) |
$ 150 |
Related Links
- Minor Violations 120.695 Certification Letter – June 30, 2017 [PDF]
- Well Construction Forms
- Permit Submittal Locations [PDF]
- Water Well Contractor List [PDF]
- Water Well Contractor Licensing FAQs [PDF]
- Accessing Well Completion Reports [PDF]
- Permit FAQs [PDF]
- Well Construction Grouting Information [PDF]
- Well Construction Section, Township and Range Fact Sheet [PDF]
- Water Management Districts of Florida Map [PDF]
- Well Construction Property Appraiser Website List [PDF]
- City of Stuart Surficial Aquifer Restriction Ordinance 1994 [PDF]
- FDEP Water Well Construction Disciplinary Guidelines and Citation Dictionary
- New Potable Water Well Permitting in Delineated Areas (FDEP 62-524)
- Underground Injection Control (FDEP 62-528)
- Water Well Contractor Licensing Requirements (FDEP 62-531)
- Water Well Permitting and Construction Requirements (FDEP 62-532)
- Drinking Water Standards, Monitoring and Reporting (FDEP 62-550)
- Permitting, Construction, Operation, and Maintenance of Public Water Systems (FDEP 62-555)
- Underground Storage Tank Systems (FDEP 62-761)
- Regulation of Wells (FL Statutes 373 Part III)
- Public Health: General Provisions (FL Statutes, Chapter 381)
- Water Wells (SFWMD 40E-3)
- Water Well Delegation Agreement