Title Description File Type File size
Evaluation of Total Nitrogen Reduction Options for the C-43 Water Quality Treatment Area Test Facility, Wetland Solutions, Inc., 2012 application/pdf 6.27 MB
C-43 Using Floating Wetland Islands to Reduce Nutrient Concentrations in Lake Ecosystems, Fred S. Lubnow, Naitonal Wetlands Newsletter, Vol. 36, 2014 application/pdf 3.81 MB
C-43 Treatment Wetlands, Biological Wastewater Series - Vol. 7, IWA Task Group, 2017 application/pdf 9.13 MB
C-43 Restoration Strategies - Science Plan Implementation, 2019 South Florida Environmental Report, Vol. 1, 2019 application/pdf 461.67 KB
C-43 Restoration Strategies - Design and Construction Status of Water Quality Improvement Projects, Jeremy McBryan and Robert Shuford, South Florida Environmental Report, Vol. 1, 2019 application/pdf 2.72 MB
C-43 Phosphrous removal performance of a large-scal constructed treatment wetland receiving eutrophic lake water, Ecological Engineering 79 (2015) 132-142 application/pdf 908.48 KB
C-43 Performance and Operation of the Everglades Stormwater Treatment Areas, South Florida Environmental Report, Vol.1, 2019 application/pdf 1.63 MB
C-43 Nitrogen dynamics of a large-scale constructed wetland used to remove excess nitrogen from eutrophic lake water, Dunne, et al., Ecological Engineering 61 (2003) 224-234 application/pdf 13.68 MB
C-43 Loveland Water and Power: Algal Mitigation Assessment, Technical Memorandum, April 14, 2017 application/pdf 9.02 MB
C-43 Large Constructed Wetlands for Phosphorus Control: A Review, Kadlec (2016) application/pdf 3.64 MB
C-43 Harmful Algal Bloom Contorl Methods Synopses, NEIWPCC, June, 2015 application/pdf 331.8 KB
C-43 Efficacy of a large-scale constructed wetland to remove phosphorus.pdf application/pdf 885.62 KB
C-43 Corrigendum to "Efficacy of large-scale constructed wetland to remove phosphorus and suspend solids from Lake Apopka, Florida," Ecological Engineering (2012) 42.90-100 application/pdf 88.76 KB
C-43 Conceptual Design of C-43 Water Quality Treatment Area Nutrient Removal/Reduction Test Facility, Wetland Solutions, Inc., 2012 application/pdf 3.3 MB
C-43 Alternative Treatments Technologies Evaluations - Sept. 2011 - June 2013, Chimney, et al. application/pdf 15.3 MB
C-43 15-C-43 Expert Panel Consolidated Final Report.pdf application/pdf 4.27 MB
C-43 13-current research and trends in alum treatment of stormwater runoff.pdf application/pdf 263.68 KB
C-43 12-technical assistance for the northern everglades chemical treatment pilot project.pdf application/pdf 5.12 MB
C-43 09-Lake Hancock Outfall Treatment Project Technical Memorandum Alternative Treatment Technologies Evaluation (August 2007).pdf application/pdf 9.1 MB
C-43 07-Caloosahatchee Nutrient White Paper - Revised Final.pdf application/pdf 8.89 MB
C-43 06-Caloos River Basin Report FDEP.pdf application/pdf 9.79 MB
C-43 04-PSTA research and demonstration project summary report.pdf application/pdf 17.68 MB