Supporting Information for Canal Evaluations |
|
application/pdf |
5.23 MB |
Stormwater Treatment Area Water and Phosphorus Budget Improvements - Phase I: STA 3/4 Cells 3A and 3B Water Budgets |
|
application/pdf |
2.4 MB |
Stormwater Treatment Area 1 West Discharge Canal Evaluation Report |
|
application/pdf |
530.64 KB |
STA-3/4 Periphyton-based Stormwater Treatment Area (PSTA) Cell Water and Total Phosphorus Budget Analyses |
|
application/pdf |
1.1 MB |
STA-1 Inflow Basin Canal Investigation Phase I Report |
|
application/pdf |
5.47 MB |
Results from Project REST Remote Environmental Sampling Test |
|
application/pdf |
1.51 MB |
Phase I Summary Report for the Use of Soil Amendments/Management to Control P Flux Study |
|
application/pdf |
1.63 MB |
Influence of Seepage on the Stormwater Treatment Area 3/4 Periphyton-based Stormwater Treatment Area Cell’s Treatment Performance |
|
application/pdf |
4.13 MB |
Evaluation of Remote Phosphorus Analyzer Measurements and Hydrologic Conditions of the STA-3/4 Periphyton-based Stormwater Treatment Area |
|
application/pdf |
532.08 KB |
Effects of Pulse Flow Events on the STA-3/4 PSTA Cell's Phosphorus Treatment Performance |
|
application/pdf |
1.81 MB |
Analysis of Effects of Sustained Moderate Flow at the Stormwater Treatment Area 3/4 Periphyton-based Stormwater Treatment Area |
|
application/pdf |
673.04 KB |
A-1 Flow Equalization Basin Seepage Study |
|
application/pdf |
4.43 MB |