Title Description File Type File size
Supporting Information for Canal Evaluations application/pdf 5.23 MB
Stormwater Treatment Area Water and Phosphorus Budget Improvements - Phase I: STA 3/4 Cells 3A and 3B Water Budgets application/pdf 2.4 MB
Stormwater Treatment Area 1 West Discharge Canal Evaluation Report application/pdf 530.64 KB
STA-3/4 Periphyton-based Stormwater Treatment Area (PSTA) Cell Water and Total Phosphorus Budget Analyses application/pdf 1.1 MB
STA-1 Inflow Basin Canal Investigation Phase I Report application/pdf 5.47 MB
Results from Project REST Remote Environmental Sampling Test application/pdf 1.51 MB
Phase I Summary Report for the Use of Soil Amendments/Management to Control P Flux Study application/pdf 1.63 MB
Influence of Seepage on the Stormwater Treatment Area 3/4 Periphyton-based Stormwater Treatment Area Cell’s Treatment Performance application/pdf 4.13 MB
Evaluation of Remote Phosphorus Analyzer Measurements and Hydrologic Conditions of the STA-3/4 Periphyton-based Stormwater Treatment Area application/pdf 532.08 KB
Effects of Pulse Flow Events on the STA-3/4 PSTA Cell's Phosphorus Treatment Performance application/pdf 1.81 MB
Baseline Soil Conditions in C-139 Fow Equalization Basin, Stormwater Treatment Area-1W Expansion #2, and A-2 Stormwater Treatment Area application/pdf 6.97 MB
Analysis of Effects of Sustained Moderate Flow at the Stormwater Treatment Area 3/4 Periphyton-based Stormwater Treatment Area application/pdf 673.04 KB
A-1 Flow Equalization Basin Seepage Study application/pdf 4.43 MB