| Supporting Information for Canal Evaluations |
|
application/pdf |
5.23 MB |
| Stormwater Treatment Area Water and Phosphorus Budget Improvements - Phase I: STA 3/4 Cells 3A and 3B Water Budgets |
|
application/pdf |
2.4 MB |
| Stormwater Treatment Area 1 West Discharge Canal Evaluation Report |
|
application/pdf |
530.64 KB |
| STA-3/4 Periphyton-based Stormwater Treatment Area (PSTA) Cell Water and Total Phosphorus Budget Analyses |
|
application/pdf |
1.1 MB |
| STA-1 Inflow Basin Canal Investigation Phase I Report |
|
application/pdf |
5.47 MB |
| Results from Project REST Remote Environmental Sampling Test |
|
application/pdf |
1.51 MB |
| Phase I Summary Report for the Use of Soil Amendments/Management to Control P Flux Study |
|
application/pdf |
1.63 MB |
| Influence of Seepage on the Stormwater Treatment Area 3/4 Periphyton-based Stormwater Treatment Area Cell’s Treatment Performance |
|
application/pdf |
4.13 MB |
| Evaluation of Remote Phosphorus Analyzer Measurements and Hydrologic Conditions of the STA-3/4 Periphyton-based Stormwater Treatment Area |
|
application/pdf |
532.08 KB |
| Effects of Pulse Flow Events on the STA-3/4 PSTA Cell's Phosphorus Treatment Performance |
|
application/pdf |
1.81 MB |
| Baseline Soil Conditions in C-139 Fow Equalization Basin, Stormwater Treatment Area-1W Expansion #2, and A-2 Stormwater Treatment Area |
|
application/pdf |
6.97 MB |
| Analysis of Effects of Sustained Moderate Flow at the Stormwater Treatment Area 3/4 Periphyton-based Stormwater Treatment Area |
|
application/pdf |
673.04 KB |
| A-1 Flow Equalization Basin Seepage Study |
|
application/pdf |
4.43 MB |