Title Description File Type File size
Water Budget Analysis for Stormwater Treatment Area 6, Section 1 (May 1, 2005 through April 30, 2007) application/pdf 2.41 MB
Water Budget Analysis for Stormwater Treatment Area 5 (May 1, 2006 - April 30, 2007) application/pdf 917.9 KB
Water Budget Analysis for Stormwater Treatment Area 2 (May 1, 2006 - April 30, 2007) application/pdf 842.36 KB
Vegetation Mapping (1998-2006) and Field Surveys (1995-2006) in the Everglades Agricultural Area Stormwater Treatment Areas application/pdf 15.63 MB
Synopsis of the Everglades Stormwater Treatment Areas, Water Year 1996-2012 (ASB-WQTT-12-001) application/pdf 5.05 MB
Supporting Information for Canal Evaluations application/pdf 5.23 MB
Stormwater Treatment Area Water and Phosphorus Budget Improvements - Phase I: STA 3/4 Cells 3A and 3B Water Budgets application/pdf 2.4 MB
Stormwater Treatment Area 1 West Discharge Canal Evaluation Report application/pdf 530.64 KB
STA-3/4 Periphyton-based Stormwater Treatment Area (PSTA) Cell Water and Total Phosphorus Budget Analyses application/pdf 1.1 MB
STA-1 Inflow Basin Canal Investigation Phase I Report application/pdf 5.47 MB
Phosphorus Flux in the Taylor Creek Stormwater Treatment Area: Potential Causes and Recommeded Control Strategies application/pdf 2.18 MB
Phase I Summary Report for the Use of Soil Amendments/Management to Control P Flux Study application/pdf 1.63 MB
Influence of Seepage on the Stormwater Treatment Area 3/4 Periphyton-based Stormwater Treatment Area Cell’s Treatment Performance application/pdf 4.13 MB
Everglades Stormwater Treatment Area Average Ground Elevations, Stage-Area/Stage-Volume Relationships and Effective Treatment Areas (ASB-WQTT-12-002) application/pdf 5.06 MB
Evaluation of the Design, Operation and Treatment Performance of Periphyton Stormwater Treatment Area (PSTA) Platforms application/pdf 1.54 MB
Evaluation of Remote Phosphorus Analyzer Measurements and Hydrologic Conditions of the STA-3/4 Periphyton-based Stormwater Treatment Area application/pdf 532.08 KB
Effects of Vegetation Management Strategies on the Establishment of Submerged Aquatic Vegetation in Cell 5B of Stormwater Treatment Area 1 West (STA1W) application/pdf 9.4 MB
Effects of Pulse Flow Events on the STA-3/4 PSTA Cell's Phosphorus Treatment Performance application/pdf 1.81 MB
Comparison of Outflow Total Phosphorus Concentrations from the Everglades Stormwater Treatment Areas Calculated with Autosampler vs. Grab Sample Data application/pdf 883.33 KB
Below the Surface: Everglades Stormwater Treatment Areas application/pdf 7.39 MB
Baseline Soil Characterization for Compartment B in Stormwater Treatment Area 2 and Compartment C in Stormwater Treatment Area 5/6 application/pdf 1.05 MB
Antecedent Land Use of the Everglades Stormwater Treatment Areas application/pdf 6.75 MB
Annual and Period-of-Record Total Nitrogen Reduction in the Everglades Stormwater Treatment Areas application/pdf 493.07 KB
Analysis of Effects of Sustained Moderate Flow at the Stormwater Treatment Area 3/4 Periphyton-based Stormwater Treatment Area application/pdf 673.04 KB
A-1 Flow Equalization Basin Seepage Study application/pdf 4.43 MB
2012 Updated Everglades Stormwater Treatment Area Average Ground Elevations, Stage-Area/Stage-Volume Relationships and Effective Treatment Areas application/pdf 5.16 MB