Update on Everglades Water Quality Strategies, June 16, 2010 |
|
application/pdf |
666.51 KB |
Compartment B and C STA Update, June 16, 2010 |
|
application/pdf |
8.28 MB |
EAA Basin Appendix A Table of Contents [PDF] |
|
application/pdf |
16.27 KB |
EAA Basin Appendix C [PDF] |
|
application/pdf |
518.97 KB |
EAA Basin Appendix C Introduction [PDF] |
|
application/pdf |
7.74 KB |
Attachment A - Revised Part 3 of Long-Term Plan |
|
application/pdf |
482.97 KB |
C-139 Basin Phosphorus Water Quality and Hydrology Analysis Phase 1 Report by ADA Engineering, Inc. Appendix C - Part 1 |
|
application/pdf |
509.36 KB |
C-139 Basin Phosphorus Water Quality and Hydrology Analysis Phase 1 Report by ADA Engineering, Inc. Appendix D - Part 1 |
|
application/pdf |
4.99 MB |
Implementation and Verification of BMPs to Reduce EAA Farm P Loads, February 25, 2010 |
|
application/pdf |
1.69 MB |
Everglades Restoration Transition Plan and Related Operational Actions - Water Quality Implications, February 25, 2010 |
|
application/pdf |
823.46 KB |
Management Measures for Sustaining Vegetation Health and Performance in STA Emergent Cells, February 25, 2010 |
|
application/pdf |
2.53 MB |
Stormwater Treatment Area Recreation Update, February 25, 2010 |
|
application/pdf |
1.39 MB |
Source Controls in Basins Tributary to the Everglades Protection Area, February 25, 2010 |
|
application/pdf |
7.5 MB |
Attachment to November 5, 2007 Long-Term Plan Minor Revision Request |
|
application/msword |
347.5 KB |
Long Term Plan Attachment C to Proposed Revisions - July 2006 |
|
application/msword |
2.55 MB |
Attachment - Revised Section 3.1 of Long-Term Plan |
|
application/pdf |
244.87 KB |
Long Term Plan Non- ECP Basin Task 5: Statistical Analysis of Rainfall & Flow |
|
application/pdf |
2.43 MB |
Long Term Plan Non- EPC BasinTask 4: Document Review and Summary |
|
application/pdf |
1.82 MB |
Long Term Plan 2008 Report Cover Letter to Governor |
|
application/pdf |
570.93 KB |
Final 2008 Report on the Long-Term Plan for Achieving Water Quality Goals |
|
application/pdf |
3.7 MB |
Updated STA Phosphorus Modeling for 2010 Planning Period |
|
application/pdf |
1.2 MB |
Updated STA Inflow Data Sets for 2010 Planning Period |
|
application/pdf |
1.37 MB |
EAA Feasibility Study Final Report Appendix I |
|
application/pdf |
1.36 MB |
Updated Flow and Phosphorus Data Sets for the ECP Basins |
|
application/pdf |
942.31 KB |
EAA Feasibility Study Final Report Appendix C |
|
application/pdf |
1.23 MB |
EAA Feasibility Study Final Report Appendix A |
|
application/pdf |
726.22 KB |
EAA Feasibility Study Final Report Appendix F |
|
application/pdf |
971.8 KB |
EAA Feasibility Study Final Report Appendix K |
|
application/pdf |
998.39 KB |
EAA Feasibility Study Final Report Appendix L |
|
application/pdf |
488.5 KB |
EAA Feasibility Study Final Report Appendix M [pdf 50mb] |
|
application/pdf |
49.1 MB |